Confidentiality Notice
This report contains confidential and proprietary information intended solely for the use of the individuals or entities to whom it is addressed. By accessing and reading this document, you acknowledge and agree to maintain the confidentiality of the information contained herein. Any disclosure, distribution, copying, or use of this information without the express written consent of Involve Space is strictly prohibited. Unauthorized dissemination or sharing of this information may constitute a violation of applicable laws and company policies, potentially resulting in legal action and/or disciplinary measures. Please ensure that you handle this information responsibly and in accordance with all relevant confidentiality agreements and regulations.
Instructions
If you intend to use this component with Finsweet's Table of Contents attributes follow these steps:
  1. Remove the current class from the content27_link item as Webflows native current state will automatically be applied.
  2. To add interactions which automatically expand and collapse sections in the table of contents select the content27_h-trigger element, add an element trigger and select Mouse click (tap)
  3. For the 1st click select the custom animation Content 27 table of contents [Expand] and for the 2nd click select the custom animation Content 27 table of contents [Collapse].
  4. In the Trigger Settings, deselect all checkboxes other than Desktop and above. This disables the interaction on tablet and below to prevent bugs when scrolling.

Involve Space actual developments:

  • Prototyping new gondola to allow hosting larger payloads and solar panels
  • Prototyping a solar system to supply energy for long duration missions
  • Integrating remote sensing equipments with On Board Computer in order to achieve real time remote sensing data transfer
  • Prototype a concentric double balloon to improve platform steering capabilities
  • Prototyping an high altitude compressor to control the platform
  • Design an attitude control system
  • Develop a constellation simulation and control software
  • Develop a new cutting system for abort launch

Hardware/Software completion ratio and progress

Number of tests performed

Last quarter: 8
Goal for the end of the next quarter: 1 every week, hence 12 per quarter

We are interested in
your feedback!

Go to the last page of the report to leave your feedback and questions